K Road Motorway Overbridge Walkway

The architecturally designed bridge barriers and covered walkways (doubling as bus shelters in chosen areas) were fabricated and installed by CAM.  The project demonstrates CAM’s abilities in engineering, project management, installation techniques and work with cutting edge materials.  Although CAM did not design the structures, our engineers were heavily involved with the architects with improvements and modifications throughout the installation.

The manufacture involved large steel components, glass, plexiglass, specialist fixings, steel panels, acrylic roofing, wood cladding and more. This project had many complexities including a tight timeframe, the need for continuing foot traffic across the bridge and safety with many multiple motorways running directly below.